Building material calculators: concrete, blocks, bricks, flooring and more

Work out how much material a building job needs: concrete, blocks, bricks, mortar, flooring, tile, paint and more, with waste allowance.

Buying too little material stops a job, and buying too much costs money. Every material calculator follows the same steps: measure the area or volume, take away openings, add an allowance for waste, then convert to whole bags, blocks, boxes or loads. The tools below do those steps for each material and show the working.

Quantities are rounded up, because you cannot buy part of a bag or box. Prices are never built in. Where a tool shows a cost, you type in your local price. All of them work in feet and inches or metric units.

Which tool do I need?

Start from your question.

The four steps behind every estimate

First measure: length times width for an area, and area times depth for a volume. Then subtract anything you will not cover, such as doors and windows on a wall. Then add an allowance for cuts, breakage and mistakes, commonly 5 to 10% for blocks, bricks and tile and more for diagonal or patterned layouts. Last, convert to the unit you buy in: bags, boxes, blocks or cubic yards.

The allowance is what separates a useful estimate from a bare area. Without it you are likely to run short. For a material you cannot easily re-order in the same batch, such as flooring or tile, buying a little extra also keeps the color consistent.

Concrete blocks, cinder blocks and CMU

A concrete block is also called a CMU, short for concrete masonry unit. People often say cinder block for the older kind made with coal cinders. Today's blocks are made with sand, gravel and cement, but the word stuck. For counting purposes they are the same.

Block sizes are named by their nominal size, which includes the mortar joint. A standard 8 × 8 × 16 inch block is really about 7⅝ × 7⅝ × 15⅝ inches, so with a 3/8 inch joint each block covers 16 × 8 inches of wall: 0.89 square feet, or about 1.125 blocks per square foot. A 20 × 8 foot wall is 160 square feet, which needs 180 blocks, or 189 with 5% waste.

Mortar for the joints is a separate purchase. The calculator estimates the volume and the bags from your joint thickness, and the bag yield printed on your bag. Filled cores, rebar and bond beams add concrete or grout on top of that and are not part of the block count.

Concrete: cubic yards, bags and waste

Concrete is ordered by volume. A slab 10 feet by 10 feet and 4 inches thick is 100 × (4 ÷ 12) = 33.3 cubic feet, which is 1.23 cubic yards because a cubic yard is 27 cubic feet. With a 10% allowance you would order about 1.36 cubic yards. Ordering a little over is normal, since uneven ground and spillage use more than the drawing says.

For small jobs you buy bags instead. The number of bags depends on the weight of the bag and how much the manufacturer says it yields, so check the label and enter the yield. Larger jobs are cheaper and more consistent from a ready-mix truck.

Flooring, tile and paint

Flooring comes in boxes that cover a fixed area. A 12 × 15 foot room is 180 square feet, and with 10% extra you need 198, rounded up to whole boxes. Measure the whole room, not only the visible floor, because the flooring runs under cabinets that are not fixed and into closets. Diagonal layouts need more waste.

Tile follows the same method, with the tile size and grout joint. Paint uses wall area minus openings, multiplied by the coats and divided by the coverage on the can. The coverage is printed on the can, so enter it rather than relying on a general figure.

Check the result before you order

Measure twice and compare the estimate to a quick mental check, such as blocks per square foot. Confirm the size, thickness and bag weight against the actual product you are buying, because brands differ. Follow local building rules for anything structural. These tools are for quantity estimates and do not replace a drawing or an engineer.

Concrete, cement and masonry

Floors, walls and ceilings

Outdoor and groundwork

Measuring and cost

Terms explained

Waste factor / allowance
Extra material added for cuts, breakage and mistakes, shown as a percentage.
Coverage
The area one bag, box or can covers, printed on the package.
Yield
The volume of mixed concrete or mortar one bag makes.
CMU
Concrete masonry unit: the formal name for a concrete block.
Cinder block
The everyday word for a concrete block.
Nominal size
The name size of a block or brick, which includes the mortar joint.
Mortar joint
The layer of mortar between blocks or bricks, often 3/8 inch.
Course
One horizontal row of blocks or bricks.
Cubic yard
A volume of 27 cubic feet, the usual unit for ordering concrete, gravel and soil.
Ready-mix
Concrete mixed at a plant and delivered by truck.

Common questions

How many concrete blocks do I need for a wall?

Divide the wall area by the area one block covers. A standard 8 × 8 × 16 inch block covers about 0.89 square feet, so a 20 × 8 foot wall needs 180 blocks, or 189 with 5% waste.

How much mortar do I need for concrete blocks?

The block calculator works it out from the joint thickness and block size. Enter the yield of your mortar bag to get the number of bags.

Are cinder blocks and concrete blocks the same?

For ordering purposes yes. Cinder block is the everyday name, and CMU is the technical one. Modern blocks are made with sand and gravel.

How much extra material should I buy?

A common allowance is 5 to 10% for blocks, bricks, tile and flooring. Use more for diagonal layouts, patterns and rooms with many corners.

How many bags of concrete do I need for a slab?

Find the volume in cubic feet (length × width × thickness), then divide by the yield printed on the bag. The concrete calculator does this and also gives the cubic yards for a delivery.

How many cubic feet are in a cubic yard?

27. A cubic yard is 3 feet by 3 feet by 3 feet.

How many boxes of flooring do I need?

Multiply the room length and width, add the waste allowance and divide by the area in one box, then round up. A 12 × 15 foot room with 10% extra needs 198 square feet.

Do these calculators include prices?

No. Where a tool shows cost, you enter your local price, so the result is always based on what you actually pay.

Can I use them for structural design?

They estimate quantities. For load-bearing walls, footings or anything structural, follow local building rules and ask an engineer.