Why use our Cement Sand Calculator?
- Three jobs in one Brickwork mortar, wall plaster and concrete, plus a reverse mode that starts from a wet mortar volume you already know.
- Three markets, treated equally The United States (feet, ASTM C270, 80 lb or 94 lb bags), Pakistan (cft, 50 kg bags, NBC ratios) and India (m³, kg, brass, IS 2250 and CPWD). The language is a separate choice.
- The dry volume factor, shown The factor used, 1.30, 1.33 or 1.54, is named in the working and can be changed, so you can check every step.
- Cost included Enter a price per bag, per unit of sand and per brick to get the total and the cost per square foot, square metre or brick.
- A visual breakdown A stacked bar shows cement, sand and water, or cement, sand and aggregate for concrete, and updates as you type.
- Free API and embed A JSON endpoint with no key and an iframe widget with the same market selector.
- Three languages, no ads English, Hindi and Urdu (right to left). Everything runs in your browser.
How to use the Cement Sand Calculator
Pick your market and the job: brickwork, plaster, concrete or known mortar. Choose feet or metres, then enter the wall or area, the thickness and the mix ratio. Doors and windows can be deducted, and results update as you type.
Choose a ratio from the list. Each one shows the standard it comes from, such as ASTM C270 Type N, NBC load bearing or IS 2250 MM 5, or pick Custom. Add waste, change the dry volume factor if your mason uses another, and set the water cement ratio.
Read the cards for bricks, wet and dry volume, cement bags and kilograms, sand in the units your market uses, water and cost. The bar and the ratio table beside it show what changes at other ratios.
To check by hand, take 100 sq ft of plaster at 1/2 inch and 1:4. The wet volume is 4.17 cft, the dry volume 5.54 cft, and a fifth of that is cement: 1.108 cft or 45.2 kg, which is 1.25 bags of 80 lb.
Dry volume = wet volume × factor (1.30 or 1.33 for mortar and plaster, 1.54 for concrete) Cement kg = dry volume × cement part ÷ total parts × 1,440 Bags = cement kg ÷ bag weight (50 kg, or 80 lb in the US) Sand m³ = dry volume × sand part ÷ total parts, cft = m³ × 35.3147, brass = cft ÷ 100 Water litres = cement kg × water cement ratio (0.4 to 0.6)
Worked examples
United States, plaster: 100 sq ft at 1/2 inch, 1:4, no waste. Wet volume 4.17 cft, dry 4.17 × 1.33 = 5.54 cft. Cement is one part in five, 1.108 cft or 45.2 kg, which is 1.25 bags of 80 lb. Sand 4.43 cft. Water 22.6 litres at 0.5.
Pakistan, brickwork: 100 cft of 9 inch wall, 9 × 4.5 × 3 inch bricks, 3/8 inch joints, 1:4, 5% waste. About 1,120 bricks fit, so buy 1,177. Wet mortar 22.3 cft, dry 28.98 cft (× 1.30), cement 236 kg or 4.73 bags of 50 kg, sand 23.2 cft, water 118 litres.
India, plaster: 100 m² at 12 mm, 1:6. Wet volume 1.2 m³, dry 1.2 × 1.33 = 1.596 m³. Cement 1.596 ÷ 7 × 1,440 = 328 kg, or 6.57 bags of 50 kg. Sand 1.368 m³, which is 48.3 cft or 0.483 brass. Water 164 litres.
Concrete, M20 (1:1.5:3): 1 m³ of wet concrete is 1.54 m³ dry, or 1.617 m³ with 5% waste. Cement 423 kg or 8.47 bags, sand 0.441 m³, aggregate 0.882 m³, water 212 litres at 0.5.
Good to know
- This is a volume method for planning. Real sand bulks when wet and compacts when stored, bricks vary in size, and masons mix by the pan or the bucket. Buy 5 to 10% extra.
- The ratios are nominal mixes by volume, as commonly quoted for ASTM C270, the Pakistan NBC and IS 2250. Real ASTM mortar types also specify lime or masonry cement, so confirm with your supplier and engineer.
- Cement is taken at 1,440 kg per m³, and sand at about 1.6 tonnes per m³ (1.68 in the US figures). Check the bag weight and your local sand, because both differ by supplier.
- Concrete, beams and slabs for structural work follow the mix design your engineer specifies. The concrete mode is a quick estimate, not a design.
Questions people ask
How many bags of cement per square foot of plaster?
At 1/2 inch and 1:4, about 0.0125 bags of 80 lb, or 0.0090 bags of 50 kg, per square foot. That is 1.25 bags of 80 lb for 100 sq ft. Thinner plaster or a leaner mix needs less.
What is the dry volume factor?
Dry cement and sand have air gaps that close when water is added, so you need more dry material than the wet volume. Common factors are 1.30 to 1.33 for mortar and plaster, and 1.54 for concrete.
Which mortar ratio should I use for brickwork?
Pakistan commonly uses 1:4 for load bearing walls and 1:6 for others. India uses 1:6 for general brickwork (IS 2250 MM 3). In the US, Type N at 1:4 suits most above grade walls.
How much sand for plastering 100 square metres?
At 12 mm and 1:6, you need 1.368 m³ of sand, which is 48.3 cft or 0.483 brass, with 6.57 bags of 50 kg cement. Add waste on top.
How many cement bags for a 10 marla house?
There is no single number, because it depends on the design. Calculate brickwork and plaster here, then add concrete with the Concrete Calculator, and keep a margin.
Is my data saved or uploaded?
No. All the maths happens in your browser and nothing is sent to a server. The link button only copies a web address with your inputs in it.
Mortar Mix Ratio Guide
United States (ASTM C270): Type M 1:3 for heavy loads and below grade, Type S 1:3.5 for general use including some below grade work, Type N 1:4 for above grade walls, Type O 1:5 for light interior work. These are shown as cement to sand parts.
Pakistan (NBC): 1:4 for load bearing brickwork and 1:6 for non load bearing walls and plaster, with a dry factor of about 1.30. Many contractors also use 1:3 for fine plaster and 1:5 for partition walls.
India (IS 2250): MM 0.7 is 1:8, MM 1.5 is 1:7, MM 3 is 1:6, MM 5 is 1:5 and MM 7.5 is 1:4 or 1:3. CPWD schedules commonly use 1:6 for brickwork and 1:4 for external plaster, with a factor of 1.33.
How to Calculate Cement and Sand for Plaster
Net area is the wall area minus doors and windows, times the number of faces. Multiply by the thickness to get the wet volume, add waste, multiply by the dry factor, then split by the ratio.
Common thickness is 12 mm (1/2 inch) for walls, 15 to 20 mm for rough or external walls and 6 mm (1/4 inch) for a finish coat. For two coats, use base and finish mode and give each its own thickness and ratio.
Dry Volume Factor Explained
One cubic metre of wet mortar needs about 1.3 cubic metres of dry cement and sand, because the sand grains settle into the cement paste. For plaster it is 1.33 in the India and US figures and about 1.30 in Pakistan. Concrete uses 1.54.
A higher factor gives more cement and sand. If your site practice differs, type your own factor in the advanced field and the working will show it.
How Many Bags of Cement per Square Foot?
Per 100 sq ft of plaster, bags of 80 lb (50 kg in brackets). At 1/4 inch: 1:3 0.78 (0.55), 1:4 0.62 (0.44), 1:5 0.52 (0.37), 1:6 0.44 (0.32).
At 3/8 inch: 1:3 1.17 (0.83), 1:4 0.93 (0.66), 1:5 0.78 (0.55), 1:6 0.67 (0.47). At 1/2 inch: 1:3 1.56 (1.10), 1:4 1.25 (0.88), 1:5 1.04 (0.74), 1:6 0.89 (0.63).
At 3/4 inch: 1:3 2.34 (1.66), 1:4 1.87 (1.33), 1:5 1.56 (1.10), 1:6 1.33 (0.95). Divide by 100 for one square foot. These use a factor of 1.33 and no waste.
Part of the guide: Building material calculators: concrete, blocks, bricks, flooring and more