Tons of asphalt to order, truckloads, base stone and cost for a rectangle, circle, triangle or trapezoid, in one or more layers.

Layers

Density 145 lb/ft³ (2,323 kg/m³)

Each layer can have its own thickness and mix, for example a 4 in base course and a 3 in surface. The tons are added up.

Typical densities. Mix designs vary, so ask your plant for its figure. Plants and labs measure it with tests such as ASTM D2726. Loose HMA is the HMA density divided by the compaction factor.

Loose mix takes up about 1.27 times its rolled volume. It sets the loose volume to haul.
A tandem dump truck carries about 20 to 25 tons.

Off by default. Asphalt weighs the same loose or rolled, so only its volume changes. Turn this on only to match a calculator that multiplies the tons.

These are planning figures, not quotes. Hot mix prices follow crude oil and change from week to week, so replace the price with a quote from your plant.

To order (tons)
19.031,000 ft² · 9.26 yd³
Truckloads
1last load 19.03 tons
Area
1,000 ft²
Compacted volume
250 ft³9.26 yd³
Compacted weight
18.13 tons
Loose volume to haul
11.76 yd³× 1.27
Covered by one ton
55 ft²
Hot mix cost
$2,28419.03 × $120
Cost per full truckload
$2,64022 tons

Small jobs may round up to the plant minimum and to a full truckload.

Cost breakdown

Hot mix

Coverage of one ton

Square feet covered by one ton at each thickness (inches) for the first layer. The dark bar is your thickness.

Step-by-step working

Worked out with your numbers. It updates as you type.

  1. Area = 50 × 20 ft = 1,000 ft².
  2. Volume = 1,000 ft² × (3 in ÷ 12) = 250 ft³.
  3. Volume in cubic yards = 250 ÷ 27 = 9.26 yd³.
  4. Compacted weight = 250 ft³ × 145 lb/ft³ ÷ 2,000 = 18.13 tons.
  5. Loose volume to haul = 9.26 yd³ × 1.27 = 11.76 yd³. The weight stays 18.13 tons, because loose and rolled mix weigh the same.
  6. Waste (5%): 18.13 × 1.05 = 19.03 tons.
  7. Truckloads (22 tons per truck): ⌈19.03 ÷ 22⌉ = 1.
  8. Hot mix cost (at $120 per ton): 19.03 × $120 = $2,283.75.

Asphalt Thickness Guide

UseCompacted thicknessTons per 1,000 ft²
Overlay on sound pavement1.5 – 2 in9.1 – 12.1
Residential driveway2 – 3 in12.1 – 18.1
Parking lot3 – 4 in18.1 – 24.2
Commercial and heavy traffic4 – 6 in24.2 – 36.3
Road base courses6 – 8 in36.3 – 48.3

Tons per 1,000 ft² use 145 lb/ft³ with no waste. These are common ranges, not design values.

Hot Mix vs Cold Patch

Hot mixCold patch
Best forDriveways, roads, lots and new workPotholes, utility cuts and quick repairs
How it is laidHot from a plant, then rolledFrom a bag or bin at any temperature, then tamped
LifespanLong, it bonds into the pavementShort, often replaced with hot mix later
Density here145 lb/ft³130 lb/ft³

Free API and embed

The same maths is available as a free JSON API. No key is needed. If you show the results on your site, please link back to this page. Dimensions are in feet and inches, or metres and millimetres with units=metric.

GET https://ivorytool.com/api/asphalt?length=50&width=20&thickness=3&mix=hma&waste=5&truck=22&price=120

Parameters: shape (rectangle, circle, triangle, trapezoid), length, width, diameter, base, height, top, bottom, thickness, mix (hma, loose, dense, sma, ogfc, cold, rap), density, layers (for example 3:hma,2:dense), waste, compaction, truck, price, base_thickness, base_density, base_price, labor, units.

To show this calculator on your site, use the embed code under the tool.

Add this calculator to your website

Free to use on any site or blog. Paste this code where you want the calculator to appear. It stays up to date, needs no account, and keeps your visitors' numbers in their own browser.

Preview

Why use our Asphalt Calculator?

  • A full toolkit in one place Rectangle, circle, triangle and trapezoid, several layers, base stone, labor, truckloads and cost. Most calculators stop at a rectangle and one number.
  • Seven mix types Hot mix, loose hot mix, dense-graded, stone mastic, open-graded, cold mix and millings, each with a typical density, or type your own.
  • Compaction and waste, shown clearly The compaction factor sets the loose volume to haul, and the waste factor adds the extra for edges and handwork. Both appear in the working.
  • US regional prices Pick Southeast, Midwest, West or Northeast for a planning range, then replace it with your plant's quote.
  • Truckloads and cost per load See how many truckloads to book, the size of the last load and what a full truck costs.
  • Charts that update as you type A cost breakdown and a coverage chart, drawn as plain SVG, with no chart library.
  • Free API and embed The same maths as a free JSON API with no key, plus an embed code for your own site.
  • English, Hindi and Urdu Every label, error and step is translated, and the page flips to right to left in Urdu.
  • No ads, no signup, no limits Your numbers stay in your browser.

How to use the Asphalt Calculator

Choose US or metric units, then the shape of the area and type in its size. US units are the default: feet and inches, tons and cubic yards. The area, volume and weight update as you type, so there is no Calculate button.

Pick the compacted thickness and the mix type. Each mix has a typical density, such as 145 lb/ft³ for hot mix asphalt, and you can type your own. For a job with more than one lift, add a layer, for example a 4 in base course and a 3 in surface. Each layer has its own thickness and mix, and the tons are added up.

Weight is the compacted volume times the density. The waste factor then adds the extra you lose at the edges and on handwork: 5% for a simple job, 10% for handwork or an odd shape. The compaction factor, 1.27 by default, tells you how much more room loose mix takes up than rolled mix, so it sets the loose volume to haul. It does not change the weight, because asphalt weighs the same loose or rolled. A switch lets you multiply the tons by it as well, to match calculators that do.

Enter the truck capacity to get the number of truckloads and the size of the last load. Choose a region for a planning price per ton, or type your own quote. You can add a crushed stone base, with its thickness, density and price, and a labor and equipment rate per square foot. The cost chart shows how the total splits.

The steps section shows every calculation with your numbers. As a check, NAPA's common rule of thumb is about 110 lb per square yard per inch of thickness, and 145 lb/ft³ gives 108.75. Plants confirm density in the lab, with tests such as ASTM D2726, so ask yours for its figure.

Area (ft²) = length × width
Volume (ft³) = area × thickness (in) ÷ 12
Compacted tons = volume × density (lb/ft³) ÷ 2,000
Tons to order = compacted tons × (1 + waste)
Truckloads = ⌈tons to order ÷ truck capacity⌉
Loose volume to haul = compacted volume × compaction factor (about 1.27)
Metric: tonnes = volume (m³) × density (kg/m³) ÷ 1,000
145 lb/ft³ is about 109 lb per square yard per inch

Worked example: a 20 by 50 ft driveway at 3 in

Area = 20 × 50 = 1,000 ft². Volume = 1,000 × (3 ÷ 12) = 250 ft³, which is 250 ÷ 27 = 9.26 yd³.

Compacted weight = 250 × 145 ÷ 2,000 = 18.13 tons. Add 5% for waste: 18.13 × 1.05 = 19.03 tons to order.

Truckloads at 22 tons per truck: 19.03 ÷ 22 = 0.87, so 1 load. Material cost at $120 per ton: 19.03 × 120 = $2,284. The loose volume to haul is 9.26 × 1.27 = 11.76 yd³.

Good to know

  • The result is an estimate for ordering. Ask your plant for its density, its minimum load and its price, because mix designs, plant minimums and prices differ.
  • The compaction factor changes the loose volume, not the weight. If you switch on the option that multiplies the tons by it, the calculator orders about 27% more mix than the job needs.
  • Region prices are planning ranges, not quotes. Hot mix prices follow crude oil and change from week to week.
  • A driveway on poor ground may need a thicker base or more than one layer. An engineer or contractor should judge that. The thickness guide shows common ranges, not design values.

Questions people ask

How many tons of asphalt do I need for a driveway?

Multiply the area in square feet by the thickness in inches, divide by 12 for cubic feet, multiply by 145 and divide by 2,000. A 20 by 50 ft driveway at 3 in is 18.13 tons, and 19.03 tons with 5% waste.

How many square feet does a ton of asphalt cover?

At 145 lb/ft³, one ton covers about 83 square feet at 2 inches, 55 square feet at 3 inches and 41 square feet at 4 inches. The thicker the layer, the less it covers.

Should I multiply the tons by the compaction factor?

No. Loose and rolled asphalt weigh the same, so the compacted weight is what you order. The factor of about 1.27 tells you how much more room loose mix takes up, which matters for hauling volume. The calculator has an optional switch for calculators that multiply the tons.

How much waste should I add to an asphalt order?

Five percent is common for a simple rectangle. Use 10% for handwork, curves and odd shapes. Small jobs may also round up to the plant minimum or a full truckload.

How thick should an asphalt driveway be?

Two to three inches of compacted asphalt is common for a car driveway, over a compacted crushed stone base of 4 to 6 inches. Parking lots usually run 3 to 4 inches, and heavy traffic 4 to 6.

How to Choose the Right Mix Type

Hot mix asphalt (HMA) is the standard choice for driveways, roads and parking lots, and the tool uses 145 lb/ft³ for it. Dense-graded mixes, at about 148 lb/ft³, are the common structural and surface mixes. Stone mastic asphalt, about 150 lb/ft³, is a rut-resistant surface for heavy traffic.

Open graded friction course, about 140 lb/ft³, is a porous surface that drains water and is lighter per cubic foot. Cold mix, about 130 lb/ft³, is for patches and temporary repairs. Millings, about 120 lb/ft³, are recycled asphalt used for driveways, shoulders and base.

These are typical densities. Ask your plant, because the real figure depends on the stone, the binder and the mix design, and a few percent either way changes the tons you order.

Hot Mix vs Cold Patch in practice

Use hot mix for anything you want to last, because it bonds into the pavement and is rolled to a high density. Use cold patch for a pothole you need to fill today, or for a utility cut in cold weather, and plan to replace it with hot mix later.

Cold patch is sold by the bag or small load and usually costs more per ton, so for any area over a few square feet, hot mix from a plant is the better value.

More worked examples

Parking lot, 10,000 ft² at 4 in: volume 3,333 ft³, which is 123.5 yd³. Compacted weight 241.7 tons, 253.8 tons with 5% waste. At 22 tons per truck that is 12 loads, and at $120 per ton the hot mix costs $30,450.

Overlay, 5,000 ft² at 1.5 in: volume 625 ft³, which is 23.1 yd³. Compacted weight 45.3 tons, 47.6 tons with 5% waste, 3 loads, and $5,709 at $120 per ton.