Concrete Slab Calculator

A full plan for a concrete slab or pad: ready-mix volume, bags, gravel base, rebar or mesh, vapour barrier, control joints and cost.

ft

ft

Common guidance only: patios and walkways 4 in, sheds and garages 4 to 6 in, driveways 5 to 6 in. Your local building rules decide.

in

4 in of compacted gravel is a common base. Enter 0 for none.

%

Uneven ground and spillage. Applies to the concrete and the gravel. 10% is a common allowance.

in

Centre to centre, each way. 16 in is common for a residential slab, 12 in for heavier loads.

%

A 6 mil polyethylene sheet is common under a floor slab. Sheds and open pads often skip it.

Delivered price. Leave empty to skip the cost.

Price for the unit chosen below. Leave empty to skip.

Concrete to order

1.63 cubic yards

ready-mix, with 10% extra

Slab area
120 sq ft
Slab thickness
4 in
Concrete before extra
1.48 cu yd (40 cu ft)
Concrete with extra, in cubic feet
44 cu ft
Bags of 60 lb
98 bags
Bags of 80 lb
74 bags
Gravel base
1.63 cu yd, about 2.28 tons
Bars running the length
8 bars of 11.5 ft
Bars running the width
9 bars of 9.5 ft
Rebar total length
177.6 ft
Rebar bars to buy
10 bars of 20 ft, with 10% for laps
Vapour barrier sheeting
132 sq ft
Control joint spacing
8 to 12 ft
Joints across the length
0 to 1
Joints across the width
0 to 1

A slab of 120 sq ft and 4 in thick needs 1.63 cubic yards of concrete with 10% extra, or about 74 bags of 80 lb if you mix from bags.

Add this calculator to your website

Free to use on any site or blog. Paste this code where you want the calculator to appear. It stays up to date, needs no account, and keeps your visitors' numbers in their own browser.

Preview

How it works

A slab is a flat box of concrete, so its volume is the area times the thickness. Enter the length and width, or the total area if the shape is irregular. Pick what the slab is for to fill in a common thickness, or enter your own. The calculator adds an allowance for uneven ground and spillage, then shows the amount to order as cubic yards or cubic metres, which is how ready-mix is sold.

For a small job you can mix from bags instead. A bag makes a fixed volume of wet concrete: an 80 lb bag about 0.60 cubic feet and a 60 lb bag about 0.45 cubic feet. That is 0.0075 cubic feet per pound. In metric the same bag works out to 0.000468 cubic metres per kilogram, so a 25 kg bag makes about 0.0117 m³ and a 50 kg bag about 0.0234 m³. The bag count is the volume with extra divided by the yield, rounded up. Other brands print a slightly different yield on the bag.

Under the slab goes a compacted gravel base, 4 inches (100 mm) by default. The calculator gives its volume and weight, using 1.4 tons per cubic yard (1.6 tonnes per cubic metre) for crushed stone. Reinforcement is a rebar grid or welded wire mesh (5 by 10 ft sheets, or 2.4 by 4.8 m in metric, with 10% for laps). For rebar, bars run both ways at your spacing and stop 3 inches (75 mm) from the edges, so the count of bars each way is the inside length divided by the spacing, rounded down, plus one.

A plastic vapour barrier goes on the gravel, lapped about 6 inches at the joints, so the sheeting area is the slab area plus 10%. Concrete cracks as it shrinks, so control joints are cut to put the cracks in straight lines. A common rule of thumb is a joint spacing in feet of 2 to 3 times the slab thickness in inches. The tool shows that range and how many joints each way it implies. Enter your own prices to see a cost, because prices vary by place and supplier.

Check it by hand: a slab 12 ft by 10 ft is 120 sq ft. At 4 inches (1/3 ft) thick the volume is 120 × 0.3333 = 40 cubic feet, which is 40 ÷ 27 = 1.48 cubic yards. Add 10% and you order 44 cubic feet, or 1.63 cubic yards. An 80 lb bag yields about 0.6 cubic feet and a 60 lb bag about 0.45, so 44 ÷ 0.45 = 98 bags of 60 lb.

Concrete (cu ft) = length (ft) × width (ft) × thickness (in) ÷ 12
Cubic yards = cubic feet ÷ 27
Order = volume × (1 + extra ÷ 100)
Bags = order in cu ft ÷ yield (80 lb = 0.60, 60 lb = 0.45 cu ft per bag)
Gravel base = area × base thickness × (1 + extra ÷ 100)
Bars each way = floor(inside length ÷ spacing) + 1
Joint spacing (ft) = 2 to 3 × thickness (in)
Yields from the Quikrete data sheet. Joint rule of thumb from common ACI 302 guidance (24 to 36 times the thickness).

Worked example

A slab 12 ft by 10 ft and 4 in thick has 12 × 10 × 4 ÷ 12 = 40 cubic feet. With 10% extra that is 44 cubic feet, or 1.63 cubic yards to order.

In bags that is 44 ÷ 0.60 = 73.3, so 74 bags of 80 lb, or 44 ÷ 0.45 = 97.8, so 98 bags of 60 lb. The 4 in gravel base is 40 cubic feet before extra, 1.63 cubic yards with 10% extra. Joints go every 8 to 12 feet.

Good to know

  • This is an estimate for a flat slab of even thickness. Thickened edges, footings, ramps and slopes need a separate calculation added on.
  • Thickness, base, reinforcement and joint layout should follow your local building rules and the ground conditions. A slab for a vehicle, a heavy load or poor soil needs a design from an engineer. The thickness presets are common guidance only.
  • Bag yields are typical figures for the brand named in the formula. The metric bag yield is converted from the 80 lb bag. Check the label on the bags you buy.
  • The joint spacing is a rule of thumb. Joints are also needed at changes of shape and around columns, and a long thin panel cracks more easily, so keep panels close to square.
  • The cost rows use only the prices you type. Ready-mix suppliers often have a minimum load and charge extra for short loads, so ask before ordering a small amount by truck.

Questions people ask

How much concrete do I need for a 12x10 slab?

A 12 by 10 foot slab that is 4 inches thick is 40 cubic feet. With 10% extra you need 44 cubic feet, or about 1.63 cubic yards. That is 74 bags of 80 lb or 98 bags of 60 lb.

How thick should a concrete slab be?

Patios and walkways are usually 4 inches (100 mm). Shed and garage floors are often 4 to 6 inches, and driveways 5 to 6 inches. Local building rules and the soil make the final call.

How many bags of concrete make a cubic yard?

A cubic yard is 27 cubic feet. That is 45 bags of 80 lb (27 ÷ 0.60) or 60 bags of 60 lb (27 ÷ 0.45).

How far apart should control joints be in a slab?

A common rule of thumb is 2 to 3 times the slab thickness in inches, as feet. A 4 inch slab gets a joint every 8 to 12 feet. Cut them to a depth of about a quarter of the thickness soon after the concrete sets.

Do I need gravel under a concrete slab?

Most slabs sit on 4 inches (100 mm) of compacted gravel. It drains water, gives an even bed and stops the concrete from cracking as the soil moves. Enter your own base thickness or 0 for none.

How do I calculate rebar for a slab?

Lay bars both ways at a set spacing, such as 16 inches on centre, and stop them 3 inches from the edges. The bars each way are the inside length divided by the spacing, rounded down, plus one. This calculator gives the count, the length of each bar and the stock bars to buy.

How many 60 lb bags for a 12 by 10 ft slab that is 4 inches thick?

98 bags with 10% extra, or 74 bags of 80 lb. For more than about a cubic yard, a ready-mix delivery is usually easier.

Part of the guide: Building material calculators: concrete, blocks, bricks, flooring and more

Formulas and text last checked on 7 October 2026. Everything is calculated in your browser, so nothing you enter is sent or stored. Spotted a mistake? Tell us and we will fix it.