Ask your supplier. Rolls in the US are often 2 by 5 feet, which is 10 square feet.
Ask your supplier. Turf rolls in the UK are often 1 square metre.
A pallet is often 400 to 500 square feet. Check with the farm.
Cuts at the edges and curves. 5% is common, 10% for a lot of curves.
Sod to order
158 rolls or slabs
1,580 sq ft with 5% extra
A lawn of 1,500 sq ft needs 158 rolls of 10 sq ft each, with 5% extra.
Typical rates for a new lawn. Follow the rate printed on your bag if it differs.
Grass seed needed
9 lb
or 4.08 kg
A lawn of 1,500 sq ft for a new lawn with tall fescue takes about 9 lb of seed.
Sod and Grass Seed Calculator by Ivorytool, free tools that run in your browser.