Baseboard and Crown Molding Calculator

Type feet, or feet and inches, such as 12.5 or 12' 6" or 12 1/2.

Doors have no baseboard, so their width is taken off.

Leave empty to use the planning range. Prices are 2026 planning averages, not quotes. Local lumber yards may vary 10 to 25%.

Paint and nails use my own planning figures, listed in the working. Replace them if you know better.

Use 2 nails per stud for baseboard, 3 for heavy profiles.

Boards to buy
512 ft each, 60 ft in all
Net run to trim
49 ft52 − 3
Length with waste
53.9 ft
Spare after the run
11 ft
Nails
7437 nail spots
Paint or stain
0.1 galfor 2 coats
Material
$42.00 to $90.00
Labor
$73.50 to $147.00
Paint or stain
$2.98 to $5.95
Nails and adhesive
$4.90 to $12.25
Installed cost
$123.38 to $255.20Cost per ft $2.52 to $5.21
Cost breakdown

MaterialLaborPaintNails

Midpoint costs: material $66.00, labor $110.25, paint $4.46, nails and adhesive $8.58. Installed total $123.38 / $255.20.

Midpoint of each range.

Miter angle
The angle between the two walls: 90 for a square corner, 135 for a bay window.
90°

Set the saw to 45° for each piece.

Corner of 90°. The dashed line is the cut.

Miter setting = (180° − corner angle) ÷ 2. That is 45° at a square corner and 22.5° at 135°. Inside corners are usually coped, not mitered. Outside corners require miter cuts.

Cut list

BoardCutsScrap
Board 1 12 ftwall 2 12 ft0
Board 2 12 ftwall 3 12 ft0
Board 3 12 ftwall 4 12 ft0
Board 4 12 ftwall 1 11 ft1 ft
Board 5 12 ftwall 3 2 ft10 ft

Doors are taken off the longest walls first, so move the cuts if yours are elsewhere. A wall longer than a board is joined, ideally on a stud. Waste is not in this list.

Step-by-step working

Worked out with your numbers. It updates as you type.

  1. Perimeter = 2 × (14 + 12) = 52 ft.
  2. Doorways taken off = 1 × 3 ft = 3 ft.
  3. Net run = 52 − 3 = 49 ft.
  4. Waste (10%): 49 × 1.10 = 53.9 ft.
  5. Boards (12 ft) = ⌈53.9 ÷ 12⌉ = 5, which is 60 ft bought.
  6. Material: 60 ft × $0.70 to $1.50 per ft = $42.00 to $90.00.
  7. Labor: 49 ft × $1.50 to $3.00 per ft = $73.50 to $147.00.
  8. Paint: 49 ft × 4.25 in ÷ 12 × 2 coats ÷ 350 ft² per gallon = 0.1 gallons. At $30.00 to $60.00 per gallon: $2.98 to $5.95.
  9. Nail spots = ⌈49 × 12 ÷ 16 in⌉ = 37. Nails = 37 × 2 = 74.
  10. Nails and adhesive allowance: 49 ft × $0.10 to $0.25 per ft = $4.90 to $12.25.
  11. Installed cost: $123.38 to $255.20, which is $2.52 to $5.21 per ft.

Baseboard and Crown Molding Calculator by Ivorytool, free tools that run in your browser.