Construction Cost Calculator
Finish multiplier 1.00× (Mid-Range: quartz, hardwood, semi-custom).
Leave empty for the national average. Five digits.
Contingency protects against unforeseen conditions. Overhead & profit covers the builder's management and margin.
- Estimated total
- $345,000Cost per sq ft, all-in $172.50
- Likely range
- $293,250 to $396,750
- Localized rate per sq ft
- $150.00National average $150.00
- Region multiplier
- 1.00×National average
- Finish multiplier
- 1.00×Mid-Range
- Direct cost
- $300,000
- Contingency (5%)
- $15,000
- Overhead and profit (10%)
- $30,000
- Build time
- 7 to 12 monthsTimelines vary by weather, permits, and labor availability.
Localized using 2026 regional cost indices. Actual contractor quotes may vary. Multipliers are state level, and only OH, CA, NY and TX come from the brief; the rest are planning estimates.
Line items
Typical items for the main building. Labor is included in every line. Garage and porch are added below.
Material takeoff preview
Rules of thumb for a wood-framed house, not a quantity survey. Order from your own plans.
Compare contractor quotes
Enter 2 or 3 totals. Anything more than 20% under the estimate may be missing scope. More than 30% over may be overpriced.
Enter 2 or 3 contractor totals to compare them with the estimate.
Step by step
Worked from your numbers. It changes as you type.
- Base rate, national average, mid-range finish, a new home: $150.00 per sq ft.
- Finish level Mid-Range: 1.00×.
- Region: national average, 1.00×.
- Localized rate = $150.00 × 1.00 × 1.00 = $150.00 per sq ft.
- Base construction = 2,000 sq ft × $150.00 = $300,000.
- Direct cost (subtotal) = $300,000.
- Contingency (5%) = $300,000 × 5% = $15,000.
- Overhead and profit (10%) = $300,000 × 10% = $30,000.
- Total estimated cost = $300,000 + $15,000 + $30,000 = $345,000.
- Cost per sq ft, all-in = $345,000 ÷ 2,000 sq ft = $172.50.
- Likely range = total −15% to +15% = $293,250 to $396,750.